[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-post-cash-flow-before-margin-zh-CN":3,"blog-adjacent-cash-flow-before-margin-zh-CN":30,"blog-related-cash-flow-before-margin-zh-CN":64},{"id":4,"slug":5,"title":6,"excerpt":7,"content":8,"cover":9,"tone":10,"author":11,"publishedAt":12,"updatedAt":12,"readingMinutes":13,"featured":14,"tags":15,"category":19,"seoSettings":29},13,"cash-flow-before-margin","现金流比利润率更重要","利润率是账面数字，现金流决定公司能不能活到下一个项目回款。","\u003Cp>做项目的公司有一个共同弱点：忙的时候没钱，闲的时候更没钱。账面利润看起来不错，但工资要按月发，供应商要按期结，回款却总在验收之后。\u003C\u002Fp>\n\u003Ch2>我们踩过的坑\u003C\u002Fh2>\n\u003Cp>有一个季度同时开了四个项目，团队扩到十二人。项目都在推进，验收却集中卡在年底，三个月的工资几乎全靠个人垫付。\u003C\u002Fp>\n\u003Cp>那次之后我们规定，任何新项目启动前先看两件事：预付款比例和回款节点。\u003C\u002Fp>\n\u003Ch2>三条现金流纪律\u003C\u002Fh2>\n\u003Cp>合同签订收三成，中期验收收四成，终验收收三成。比例可以谈，但不能没有预付款。\u003C\u002Fp>\n\u003Cp>每月做一次回款预测，把已开票未回款、已验收未开票的项目分开列，逾期超过三十天由负责人跟进。\u003C\u002Fp>\n\u003Cp>账上常备三个月固定成本，不因为一个看起来很大的单子就打乱这条底线。\u003C\u002Fp>\n\u003Cp>利润决定公司能走多远，现金流决定公司能不能走到明天。\u003C\u002Fp>","","teal","佳益方圆团队","2026-09-01T12:39:00+08:00",1,false,[16,17,18],"创业","现金流","经营",{"id":20,"parentId":21,"slug":22,"name":23,"description":24,"icon":25,"cover":9,"tone":26,"kind":27,"sortOrder":28,"count":21},6,0,"founder-notes","创业手记","创始团队在经营、管理与产品上的思考，记录一家软件公司的成长过程。","pen-tool","blue","article",10,{},{"previous":31,"next":48},{"id":32,"slug":33,"title":34,"excerpt":35,"content":9,"cover":9,"tone":36,"author":11,"publishedAt":37,"updatedAt":37,"readingMinutes":13,"featured":14,"tags":38,"category":42},111,"ai-adoption-reality","AI 落地的现实：从演示到上线","AI 演示的效果经常很惊艳，上线之后的使用率却很低。差距在哪里？","indigo","2026-09-03T12:39:00+08:00",[39,40,41],"行业观察","人工智能","落地",{"id":43,"parentId":21,"slug":44,"name":39,"description":45,"icon":46,"cover":9,"tone":26,"kind":27,"sortOrder":47,"count":21},5,"industry-watch","对互联网、软件与数字化行业趋势的深度分析，输出团队自己的判断。","globe",20,{"id":49,"slug":50,"title":51,"excerpt":52,"content":9,"cover":9,"tone":26,"author":11,"publishedAt":53,"updatedAt":53,"readingMinutes":13,"featured":14,"tags":54,"category":58},34,"nuxt-ssr-cache-strategy","Nuxt SSR 的缓存与首屏速度","服务端渲染不等于快。首屏速度取决于数据请求的组织方式，而不是渲染模式本身。","2026-08-30T13:52:00+08:00",[55,56,57],"Nuxt","SSR","性能",{"id":13,"parentId":21,"slug":59,"name":60,"description":61,"icon":62,"cover":9,"tone":26,"kind":27,"sortOrder":63,"count":21},"engineering","技术专栏","架构设计、性能优化、AI 集成与跨端方案等一线技术实践，由研发团队持续分享。","cpu",60,[65,74,85],{"id":28,"slug":66,"title":67,"excerpt":68,"content":9,"cover":9,"tone":26,"author":11,"publishedAt":69,"updatedAt":69,"readingMinutes":13,"featured":14,"tags":70,"category":73},"quote-by-scope-not-hours","我们为什么不按人天报价","按人天报价看起来公平，实际把不确定性都推给了客户。我们更愿意先讲清范围和假设，再谈价格。","2026-10-07T09:00:00+08:00",[16,71,72],"报价","合作方式",{"id":20,"parentId":21,"slug":22,"name":23,"description":24,"icon":25,"cover":9,"tone":26,"kind":27,"sortOrder":28,"count":21},{"id":75,"slug":76,"title":77,"excerpt":78,"content":9,"cover":9,"tone":79,"author":11,"publishedAt":80,"updatedAt":80,"readingMinutes":13,"featured":14,"tags":81,"category":84},11,"three-lessons-from-first-client","第一单客户教会我们的三件事","2019 年的第一个项目只有三万元，却让我们明白了合同、验收和沟通的分量。","cyan","2026-09-25T10:13:00+08:00",[16,82,83],"客户","合同",{"id":20,"parentId":21,"slug":22,"name":23,"description":24,"icon":25,"cover":9,"tone":26,"kind":27,"sortOrder":28,"count":21},{"id":86,"slug":87,"title":88,"excerpt":89,"content":9,"cover":9,"tone":36,"author":11,"publishedAt":90,"updatedAt":90,"readingMinutes":13,"featured":14,"tags":91,"category":93},12,"choosing-clients-not-deals","选客户比选项目重要","同一份合同，有的客户让团队成长，有的客户让团队耗尽心气。我们用三个问题筛选客户。","2026-09-13T11:26:00+08:00",[16,82,92],"选择",{"id":20,"parentId":21,"slug":22,"name":23,"description":24,"icon":25,"cover":9,"tone":26,"kind":27,"sortOrder":28,"count":21}]