[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"blog-post-low-budget-project-retro-zh-CN":3,"blog-adjacent-low-budget-project-retro-zh-CN":30,"blog-related-low-budget-project-retro-zh-CN":60},{"id":4,"slug":5,"title":6,"excerpt":7,"content":8,"cover":9,"tone":10,"author":11,"publishedAt":12,"updatedAt":12,"readingMinutes":13,"featured":14,"tags":15,"category":19,"seoSettings":29},76,"low-budget-project-retro","低预算项目复盘：省钱省在哪里","预算只有同类项目一半，怎么做才能不牺牲质量？答案是砍范围，不砍基础。","\u003Cp>这是一个预算十五万的内部管理系统，同类项目通常要三十万。客户很清楚预算有限，希望先上线核心功能。我们用三个月完成，回看有几个决定是对的，也有一个失误。\u003C\u002Fp>\n\u003Ch2>做对的三件事\u003C\u002Fh2>\n\u003Cp>砍到只有一条业务线，其他线暂时用线下表格，接口预留但不实现。\u003C\u002Fp>\n\u003Cp>后台直接复用我们的组件库，界面统一但不做定制设计，省下大约三周。\u003C\u002Fp>\n\u003Cp>测试聚焦在金额计算和权限，界面细节由使用部门验收时确认。\u003C\u002Fp>\n\u003Ch2>一个失误\u003C\u002Fh2>\n\u003Cp>为了省钱没有做数据导入工具，开业初期两万条历史数据靠人工录入，客户多花了十天。\u003C\u002Fp>\n\u003Cp>如果重来，我们会做一个简单的 Excel 导入，成本大约两天，收益远大于投入。\u003C\u002Fp>\n\u003Cp>低预算项目的原则是砍范围、砍定制、砍边缘，但不砍数据准确性和权限。省错了地方，最后要花更多时间补。\u003C\u002Fp>","","teal","佳益方圆团队","2026-08-02T15:18:00+08:00",1,false,[16,17,18],"复盘","预算","范围管理",{"id":20,"parentId":21,"slug":22,"name":23,"description":24,"icon":25,"cover":9,"tone":26,"kind":27,"sortOrder":28,"count":21},3,0,"project-retrospective","项目复盘","从 0 到 1 的真实项目记录，完整呈现问题、方案、踩坑经验与最终结果。","clipboard-check","blue","article",40,{},{"previous":31,"next":49},{"id":32,"slug":33,"title":34,"excerpt":35,"content":9,"cover":9,"tone":36,"author":11,"publishedAt":37,"updatedAt":37,"readingMinutes":13,"featured":14,"tags":38,"category":42},56,"form-design-tradeoffs","表单设计：少一个字段多一成完成率","每个字段都有成本。设计表单的本质是决定哪些信息现在必须要。","cyan","2026-08-04T15:18:00+08:00",[39,40,41],"表单","产品设计","B 端",{"id":43,"parentId":21,"slug":44,"name":45,"description":46,"icon":47,"cover":9,"tone":26,"kind":27,"sortOrder":48,"count":21},2,"product-thinking","产品思维","需求分析、用户体验与产品设计方法论，以及从业务问题到产品方案的思考过程。","lightbulb",50,{"id":50,"slug":51,"title":52,"excerpt":53,"content":9,"cover":9,"tone":54,"author":11,"publishedAt":55,"updatedAt":56,"readingMinutes":13,"featured":14,"tags":57,"category":59},8,"project-retrospective-practice","项目复盘怎么开才有效：我们的一次真实复盘","复盘不是追责会，也不该是流程表演。它只需要解决一个问题：下一次怎样做得更好一点。","slate","2026-08-01T17:00:00+08:00","2026-10-18T15:58:14.744+08:00",[23,58],"团队文化",{"id":20,"parentId":21,"slug":22,"name":23,"description":24,"icon":25,"cover":9,"tone":26,"kind":27,"sortOrder":28,"count":21},[61,72,82],{"id":62,"slug":63,"title":64,"excerpt":65,"content":9,"cover":9,"tone":66,"author":11,"publishedAt":67,"updatedAt":67,"readingMinutes":13,"featured":14,"tags":68,"category":71},70,"gov-project-acceptance","政务项目复盘：验收为什么拖了半年","功能早已上线，验收却迟迟没有完成。问题往往不在系统，而在文档、流程和沟通节奏。","indigo","2026-10-13T09:00:00+08:00",[16,69,70],"政务项目","验收",{"id":20,"parentId":21,"slug":22,"name":23,"description":24,"icon":25,"cover":9,"tone":26,"kind":27,"sortOrder":28,"count":21},{"id":73,"slug":74,"title":75,"excerpt":76,"content":9,"cover":9,"tone":36,"author":11,"publishedAt":77,"updatedAt":77,"readingMinutes":13,"featured":14,"tags":78,"category":81},71,"mes-integration-retro","制造企业 MES 对接复盘","系统对接最难的部分不是接口，而是让两个部门对同一个字段达成一致。","2026-10-01T10:13:00+08:00",[16,79,80],"制造业","系统集成",{"id":20,"parentId":21,"slug":22,"name":23,"description":24,"icon":25,"cover":9,"tone":26,"kind":27,"sortOrder":28,"count":21},{"id":83,"slug":84,"title":85,"excerpt":86,"content":9,"cover":9,"tone":10,"author":11,"publishedAt":87,"updatedAt":87,"readingMinutes":13,"featured":14,"tags":88,"category":91},72,"cross-border-site-retro","跨境独立站复盘：流量到了，转化没到","网站上线后广告投放正常，询盘却很少。复盘发现，问题集中在信任和填写成本上。","2026-09-19T11:26:00+08:00",[16,89,90],"跨境","转化",{"id":20,"parentId":21,"slug":22,"name":23,"description":24,"icon":25,"cover":9,"tone":26,"kind":27,"sortOrder":28,"count":21}]